ACMI Leasing Into the United States: FAA Rules and Foreign Carrier Requirements

Guide to FAA Part 129, DOT economic authority and wet-lease rules for foreign ACMI operators flying into the United States.

Share

How Foreign ACMI Operators Gain U.S. Operating Authority

The United States is the world's largest ACMI market, but it is also one of the hardest to enter. A European or Asian wet-lease operator cannot simply fly a client's passengers or cargo into a U.S. airport on the strength of its home-country licence. Two separate regulators must approve the operation, and the operating model determines which entity retains legal control of the flight.

This guide explains how foreign ACMI providers obtain U.S. operating authority, what the FAA and Department of Transportation each require, and where the practical bottlenecks sit for airlines and lessors planning wet-lease capacity into the United States.

For a comparison of how other jurisdictions handle wet leasing, see ACMIWorld's guides to EU and UK wet-lease approval rules and ACMI leasing into India under DGCA rules.

Safety authority FAA Part 129 operations specifications for foreign air carriers
Economic authority DOT foreign air carrier permit under 49 U.S.C. 41301
Wet-lease control Operational control and DOT statement of authorization

Two regulators, two separate approvals

Foreign carriers frequently assume that an FAA approval is the whole process. It is not. The FAA issues Part 129 operations specifications, which govern how a foreign carrier may operate within U.S. airspace. The DOT issues a foreign air carrier permit, which is the economic authority to engage in foreign air transportation to and from the United States. The DOT itself describes these as separate authorisations: economic authority from DOT, safety authority from FAA.

A foreign ACMI operator needs both. Without a DOT permit, it cannot hold out or operate the commercial service. Without Part 129 OpSpecs, it cannot legally enter U.S. airspace. The two processes run on different timelines and different evidence standards, which is why early planning matters more than in most other ACMI markets.

The FAA Part 129 route

Part 129 applies to each foreign air carrier operating within the United States. The application for operations specifications must be submitted at least 90 days before the intended date of operation and in the form and manner prescribed by the FAA Administrator.

The OpSpecs themselves define the scope of what the carrier may do: aircraft types, areas of operation, kinds of operation, and any limitations. A recent example is KlasJet's Part 129 approval for U.S. ACMI and charter operations with Boeing 737NGs, reported in September 2026. KlasJet already held DOT, TSA and CBP approvals; the FAA OpSpecs were the final step. The company noted that its ACMI and charter flying must stay within the limits of those OpSpecs and DOT conditions.

That sequencing is typical. Foreign operators often secure DOT economic authority and security clearances first, then close out the FAA OpSpecs. The 90-day filing window is a minimum, not a target: complex fleet or route approvals can take longer.

The DOT foreign air carrier permit

The DOT permit is the economic licence. A foreign carrier must file a public docket application under 14 CFR Part 211, and the DOT assesses fitness, citizenship and reciprocity. The permit defines the carrier's authority to provide foreign air transportation to and from the United States.

For ACMI specifically, the permit is not the end of the story. The wet-lease transaction itself can trigger a separate DOT statement of authorization, depending on whether the lease is long-term and which party holds operational control. FAA guidance notes that a U.S. certificated carrier must obtain a statement of authorization for each long-term wet lease to a foreign air carrier, and the wet lessor may also need DOT/OST prior authorisation.

Operational control is the deciding issue

U.S. wet-lease rules are built around a single question: which party has operational control? The FAA does not simply accept the contract's label. Under 14 CFR 119.53, when a wet lease is filed, the Administrator determines which party has operational control and issues OpSpec amendments to each party as needed. The factors considered include crewmembers and training, airworthiness and maintenance, dispatch, servicing, scheduling, and any other relevant factor.

This matters commercially as well as regulatorily. A foreign ACMI provider flying for a U.S. carrier may be treated as the operator for some purposes and the U.S. carrier for others. FAA policy for a wet lease between a U.S. carrier and a foreign carrier requires the U.S. carrier to have operational control and economic authority for the lease. Getting this boundary wrong can invalidate the approval and expose both parties to enforcement action.

For a broader explanation of how control is allocated in wet-lease structures, see ACMIWorld's guide to operational control in aviation, and for contract mechanics see ACMI contract clauses airlines should negotiate.

Cabotage: what foreign ACMI cannot do

The most important commercial limit is cabotage. Foreign carriers cannot carry traffic between two points within the United States as if they were a domestic airline. Cabotage is prohibited under 49 U.S.C. 41703.

In practice, this means a foreign ACMI operator can fly international sectors to and from the United States, and can operate within U.S. territory only within the scope of its Part 129 OpSpecs and any applicable traffic rights. It cannot simply substitute for a U.S. domestic carrier on domestic routes. For background, see ACMIWorld's explainer on cabotage in aviation and the related guides to fifth-freedom and seventh-freedom traffic rights.

Practical checklist for foreign ACMI operators entering the U.S.

  • Confirm the traffic-rights basis: check the bilateral air services agreement between the operator's state and the United States before assuming access.
  • File DOT economic authority early: the Part 211 docket is a public process and should not be left until an aircraft is ready to fly.
  • Plan the Part 129 OpSpec application at least 90 days out: treat this as a floor, not a realistic timetable for a new fleet type.
  • Decide who holds operational control before drafting the lease: the FAA will look past the contract label to crew, maintenance, dispatch and scheduling.
  • Check whether a DOT statement of authorization is required: long-term wet leases involving U.S. or foreign carriers can trigger prior authorisation requirements.
  • Do not plan cabotage: foreign ACMI cannot replicate a U.S. domestic operator on domestic point-to-point routes.
  • Align security and customs approvals: TSA and CBP approvals are separate from FAA and DOT and should run in parallel.
  • Stress-test the commercial model: U.S. clients often want short-notice seasonal cover; the regulatory lead time may not match their procurement cycle.

Why the U.S. market is still worth the effort

Despite the regulatory burden, the United States remains the largest addressable ACMI market. It combines deep domestic networks, sharp seasonal demand swings and a chronic shortage of flexible narrowbody and widebody capacity during peak periods. KlasJet's entry was explicitly aimed at seasonal peaks and capacity shortfalls, with the company arguing that ACMI lets carriers add capacity without permanently adding aircraft and crews.

For foreign operators, the strategic question is whether the U.S. opportunity justifies the fixed cost of regulatory entry. For U.S. carriers and forwarders, the question is which foreign providers have actually completed the process rather than merely started it. ACMIWorld's ranking of top ACMI airlines in Europe and our analysis of why airlines are turning to ACMI in 2026 give context on the supply side.

Final view

Foreign ACMI access to the United States is a two-regulator, multi-step process. The FAA governs safety through Part 129 OpSpecs; the DOT governs economic authority through the foreign air carrier permit; and the wet lease itself can require a separate statement of authorization depending on duration and control. Operational control is the hinge on which approval turns, and cabotage is the hard limit on what the operation can commercially achieve.

For operators, the practical lesson is to treat regulatory entry as a programme, not a formality. For buyers, the lesson is to verify that a provider holds both approvals and that the OpSpecs actually cover the aircraft type and route being proposed.

Structuring ACMI capacity into or out of the United States?

Cross-border wet-lease programmes need the right aircraft, the right operating authority and the right contract structure. For aircraft leasing enquiries, visit Blue Cube Aviation.

Request an Aircraft Leasing Quote
Editorial note: This ACMIWorld guide is based on U.S. federal aviation regulations and publicly available company information reviewed in November 2026. Regulatory requirements and processing times can change. Operators and buyers should confirm current requirements with the FAA, DOT and their aviation counsel before committing to a U.S. wet-lease programme.
Operating ACMI capacity into the United States and want to be considered for future ACMIWorld coverage? For partnerships, media, and collaboration opportunities, contact us directly at info@acmiworld.com.