How to Arrange an ACMI Wet Lease: Process, Approvals and Timeline

The steps from a capacity brief to a signed ACMI wet lease and first flight, including approvals, commercial terms, and where to list or request aircraft.

Share
Passenger aircraft climbing after dispatch on an ACMI wet-lease programme
Photo via Unsplash

Arranging an ACMI wet lease is a contracting and regulatory process: a capacity brief, a shortlist of operators, commercial terms, approvals, then induction and first flight. It is not a one-click booking, and it is not the same as chartering a single trip. ACMI, aircraft, crew, maintenance and insurance, is a wet lease in which the lessor operates the aircraft under its own air operator certificate for a defined term and a defined block of hours.

This article is a process guide for an airline, a start-up, or a charter operator that needs capacity. It does not retell what ACMI is in general terms, and it does not rank European ACMI airlines. For the legal difference between wet and dry, use wet lease versus dry lease. For clause-level negotiation, use ACMI contract clauses airlines should negotiate. Start-up and recovery use cases are covered in ACMI lease for startup airlines and short-term ACMI lease for schedule recovery.

Aircraft wing in flight on a route of the kind planned in an ACMI wet-lease brief
Photo via Unsplash

The steps from a capacity brief to first flight

  1. Write a brief that an operator can price: aircraft type or payload, seats or cargo, hours, bases, start date, and term.
  2. Find capacity: marketplace listings, a wanted post, and a shortlist of operators that actually fly the type in the region you need. A starting point for European operators is top 10 ACMI airlines in Europe, used as a list, not as a substitute for due diligence.
  3. Agree commercial terms in principle: block-hour or monthly structure, minimum guaranteed hours, what is included, what is a pass-through, and who does what at the base.
  4. Plan approvals and traffic-right issues in parallel, not after the contract is signed. The lessee usually owns the approval file with its competent authority, even when the lessor supplies supporting documents.
  5. Document the contract, insurance, and operations interface.
  6. Induct the aircraft and crew, then release the first commercial sector only when the operations and approval work is actually finished.

Those last induction tasks are their own checklist, in wet-leased aircraft induction checklist. This page stops at how you get to a signed path.

What to specify in the brief

A brief that can be priced, and later contracted, usually includes:

  • Aircraft family and, if you have a preference, the variant, engine, and cabin or cargo configuration.
  • Seats or payload, and any special loads: ETOPS, performance, or cargo door requirements.
  • The start date and the term, including any option to extend, and whether the need is seasonal, a coverage gap, or a new route.
  • Bases, typical sectors, planned monthly hours, and a realistic peak month, because minimum guaranteed hours will be set against that plan.
  • Who provides fuel, handling, parking, and passenger or cargo services at each base.
  • Whether you need the aircraft in your own livery, and how long a paint or decal window can be tolerated.
  • The regulatory picture: your AOC, the states you will fly, and whether a third-country operator is even a candidate.

If you cannot yet name hours or a start date, you can still post a wanted request, but you should not expect a firm offer. Operators price calendars and crews, not vague interest.

Finding capacity

Use more than one channel, then shortlist. Browse what is already listed on the marketplace, post a wanted notice so operators can respond, and speak only to parties that can show an AOC, insurance, and a type that matches the brief. Listing aircraft, if you are on the lessor side, is done through list your aircraft.

A shortlist should be small enough to diligence: operating history on the type, where the aircraft is today, crew availability for your start date, and whether the operator has recently done similar deployments. A long list of names is not a process.

Approvals and traffic-right issues the lessee must plan for

A wet lease does not remove the lessee's need to think about approvals. If you are an EU or EEA airline taking a wet-leased aircraft from a third-country operator, your competent licensing authority has a formal role under Regulation (EC) No 1008/2008. That rule is summarised in EASA and EU third-country wet-lease approvals. Treat approvals as a workstream from day one, not as a closing item.

Even when both parties are in the same regulatory area, a wet lease is still a safety and operations approval matter for the lessee, and traffic rights stay with the airline that is selling the seats or the cargo. Cabotage, fifth-freedom, and winter or summer slot constraints are not solved by the ACMI contract. Put them on the same timetable as the commercial negotiation.

If you do not hold an AOC and you were hoping to "rent a wet-leased airline" as a short cut into scheduled flying, stop and get aviation counsel. ACMI is a capacity tool for operators, not a substitute for an operating licence.

Commercial terms to agree before lawyers finish the contract

Lawyers should not be the first people to discover a disagreement about hours or fuel. Agree, at least in a term sheet or a clear email record:

  • The rate basis (block hour, flight hour, or a monthly package) and what the rate includes.
  • Minimum guaranteed hours, how unused hours are treated, and the rate for hours above the minimum.
  • Pass-throughs: fuel, navigation, landing, handling, and similar items, and who purchases them.
  • The responsibility split for maintenance, delayed aircraft, crew hotels, and base facilities.
  • Insurance, additional insureds, and what happens if cover changes mid-term. That split deserves its own contract schedule, and is set out in ACMI wet-lease insurance: hull, liability and war risk.
  • Sub-charter, substitution, and early-termination rights.

The clause article linked above is the place for wording. This list is the commercial agenda you should close first, so the contract is documenting an agreement, not inventing one.

Realistic lead time, and what delays induction

Lead time is driven by aircraft and crew availability, painting or cabin changes, training, base set-up, and approvals. It is not a single published number, and this article does not invent one. A short-term recovery lease on a type the lessee already knows can be faster than a seasonal programme that needs a new base, a livery, and a third-country approval file.

What usually delays first flight is late documents, a start date that was sold before the approval clock was understood, crew or simulator slots, and airport or handling contracts that were left until the aircraft was already on its way. Start those workstreams when you shortlist, not when the lease is signed.

If a dry lease would be a better fit, because you can put the aircraft on your own certificate and want control of the cabin and the crew, use the wet-versus-dry guide rather than forcing a wet structure.

Keep a single owner on the lessee side for the file: someone who can answer hours, bases, and start date, and who can chase the competent authority, insurance, and ground handling in the same week. Split ownership between network planning, legal, and operations without a coordinator is a common reason a term sheet sits unsigned.

On the lessor side, the same discipline applies. Do not promise a start date the crew or the aircraft cannot meet, and do not treat a wanted post as a firm order until the brief, the term, and the approval path are clear. A clean file is faster than a rushed one that later has to be re-traded because the hours or the registration were never confirmed.

FAQ

How far in advance should we start?

Start as soon as the need is real enough to write a brief with hours and a start date. Seasonal programmes and any approval that involves a third-country aircraft should be started earlier than a like-for-like coverage lease on a familiar type. There is no single official lead time that fits every file.

Do we need our own AOC?

The lessor flies the aircraft on its own AOC. The lessee, if it is an airline selling a schedule, still needs its own authority to operate air services and to hold the relevant traffic rights. ACMI does not replace that.

What is usually in the lessee's approval file?

It depends on the state. Expect the lease, proof of the lessor's authority and insurance, a description of the operation, and any forms the competent authority requires. The lessee should own the timetable even when the lessor supplies papers.

When is a dry lease a better fit?

When you can crew, maintain, and insure the aircraft on your own certificate and want operational control of the tail. See the wet-versus-dry comparison rather than a short restatement here.

Where do we look for aircraft or operators?

Post a wanted request, browse listings, and shortlist operators that match the type and region. A listicle is a starting map, not a diligence file.

Start a search or list capacity

If you need ACMI capacity, post the aircraft, hours, bases, and start date. Operators and lessors can list aircraft on the same marketplace.

Post an aircraft wanted, browse the marketplace, or list your aircraft.

Airline due diligence on the ACMI lessor

Airline due diligence, in an ACMI context, is the work the lessee does on the operator that will fly the aircraft. It is not the same as technical due diligence on an airframe you intend to buy, although you may still commission a technical review of the offered tail. Before you treat a start date as firm, review the lessor's air operator certificate and operations specifications, insurance certificates, recent deployments on the type, crew availability for your dates, maintenance arrangements at the planned base, and any approval conditions that will sit on your file. Ask for evidence, not a brochure. For technical specialists, start with top 10 aircraft technical due diligence firms. For the documents and interface after signature, use the wet-leased aircraft induction checklist.